EV charger installation
EV charger installation for businesses
Workplace, fleet, customer and public EV charging for offices, industrial estates, depots and car parks. Tell us about your site and we'll match you with vetted UK installers, with grant-supported, leased or fully funded options.
Best suited to
Get your free EV charging site check
Connectivity for every charger
Smart chargers need a reliable data connection to take payments, run load management and report faults. Our sister company GleeSim supplies multi-network 4G IoT SIMs for EV chargers, with fixed IP options, so chargers stay online when car park Wi-Fi can't reach.
See EV charger SIMs at GleeSimPower for the chargers
Chargers change how much electricity your site uses and when. We compare 24+ UK suppliers for a contract that fits the new load, and can add solar and battery storage to cut the cost of every charge.
Get a business energy quoteGlee Energy matches UK businesses, landlords and public bodies with vetted EV charger installers and charge point operators. Tell us about your car park and we'll check what your site needs, which grants apply and whether it qualifies for fully funded charging, then introduce you to installers ready to quote. The site check is free.
Costs, funding and how Glee Energy helps
How much does it cost to install EV chargers at a business?
As a rough guide, a 7 kW workplace charger typically costs around £1,000 to £2,000 per charger installed, 22 kW chargers more, and a 50 kW rapid charger tens of thousands of pounds. The biggest variables are digging and cabling across the car park and whether your electricity supply needs upgrading. A site survey sets the real price, and grants and tax relief can reduce it.
Can my business get EV chargers installed for free?
Often, yes, if your car park gets regular visitors or public traffic. Under a funded or revenue-share model, a charge point operator pays for, installs, owns and maintains the chargers, sets the charging price and shares income with you or pays you rent, usually over 10 to 15 years or more. It suits retail parks, hotels, leisure sites, public car parks and busy business parks. Staff-only car parks usually buy or lease their chargers instead.
How does Glee Energy help with EV charger installation?
We check your site, number of parking spaces, users and power supply, then introduce you to UK installers and charge point operators suited to your project, whether you want to buy, lease or have chargers fully funded. The check is free and there's no obligation. Installers pay Glee Energy an introduction fee, not you.
What size of site do you work with?
We work best with car parks of 10 or more spaces, industrial estates, business parks, fleet depots, public sector sites and groups with several sites. Smaller sites are welcome to enquire, and we'll tell you honestly if a single charger is better bought direct.
EV charging grants and tax relief
Is there a government grant for workplace EV chargers in 2026?
Yes. The Workplace Charging Scheme pays up to £500 per socket for installations completed from 1 April 2026, for up to 40 sockets across your sites, and is open until 31 March 2027. State-funded education institutions can claim up to £2,000 per socket. The installer must be authorised for the scheme. The separate staff and fleet car park grant and the landlord chargepoint grants closed on 31 March 2026.
Can my business claim tax relief on EV chargers?
Yes. Businesses buying new EV chargepoints can claim a 100% first-year allowance, deducting the full cost from taxable profits in the year of purchase. It currently applies to spending up to 31 March 2027 for Corporation Tax and 5 April 2027 for Income Tax. Check the details with your accountant.
Is free workplace charging a taxable benefit for employees?
No. Under HMRC's workplace charging exemption, employees can charge their own or company electric cars at or near work for free without paying benefit-in-kind tax, as long as charging is available to staff generally.
Choosing chargers and checking your power supply
Should we install 7 kW, 22 kW or rapid chargers?
Match the charger to how long cars stay. 7 kW AC chargers suit staff and all-day parking, adding roughly 25 to 30 miles of range per hour. 11 to 22 kW AC suits shorter stays, though many cars can only take 11 kW on AC. Rapid DC chargers from 50 kW suit fleets, visitors and public sites where drivers stop for under an hour.
Does my building have enough electricity supply for EV chargers?
Many sites can add several 7 kW chargers on their existing supply using load management, which shares available power between chargers. Larger numbers of chargers, or rapid chargers, may need a supply upgrade from your local network operator (DNO), which adds cost and time. A survey checks your incoming supply, spare capacity and the cable run to the car park.
How many EV chargers does my car park need?
Start with today's demand: how many staff, fleet vehicles and visitors drive electric. Then plan for growth by laying ducting and cabling for more chargers while the ground is open, which is much cheaper than digging twice. Many businesses install for around 10% to 20% of spaces and future-proof the rest.
What building regulations apply to EV charging at commercial sites?
In England, new non-residential buildings with more than 10 parking spaces, and major renovations of them, must have at least one chargepoint and cable routes for one in five spaces under Part S of the Building Regulations. Scotland and Wales have their own requirements. Existing car parks with no building work are not required to add chargers.
Do I need planning permission for EV chargers in a car park?
Often not. In England, permitted development rights cover most wall-mounted and upstand chargers in off-street car parks, within size and siting limits. Listed buildings, conservation areas, and large rapid charging hubs with substations may need permission, and rules differ in Scotland, Wales and Northern Ireland. Your installer checks this during the survey.
Running your chargers
Can we charge staff, visitors or the public to use our chargers?
Yes. Smart chargers connect to a back-office system where you set prices, give staff or fleet drivers free or discounted access, and collect payments. Chargers open to the public must meet the Public Charge Point Regulations 2023, including contactless payment on new chargers of 8 kW and above, a 24/7 helpline and open pricing data.
Do business EV chargers have to be smart chargers?
Chargers sold for private use in Great Britain, such as workplace chargers, must be smart: able to connect online and shift charging away from peak times. Smart chargers also let you monitor use, manage power and bill users.
Who maintains the chargers?
Under a funded model, the charge point operator maintains and repairs the chargers. If you buy or lease, take a maintenance and support contract with a response time and an uptime target, as broken chargers frustrate drivers fast.
How do EV chargers connect to the internet?
Most smart chargers connect to their back office using a 4G SIM, Ethernet or Wi-Fi, using a standard protocol called OCPP. In car parks, Wi-Fi rarely reaches and Ethernet means more digging, so a 4G SIM is usually the most reliable choice. Our sister company GleeSim supplies multi-network IoT SIMs for EV chargers, with fixed IP options.
Will EV chargers increase our electricity bill?
Yes, the site will use more electricity, so check your supply contract fits the new load and time of use. Glee Energy compares 24+ UK suppliers, and solar panels with battery storage can supply part of the charging load at a lower cost. If you charge users, the tariff should cover the electricity and running costs.
Industrial estates, fleets and multi-site groups
Can a landlord install EV chargers on an industrial estate or business park?
Yes. Landlords and managing agents can install shared chargers for tenants and visitors, either buying them or using a funded operator who shares income. EV charging makes units more attractive to tenants with fleet and ESG targets. Lease terms and service charges should set out who pays for and uses the chargers.
How do we install charging for an electric fleet depot?
Start with a power assessment: how many vehicles, their battery sizes, mileage and how long they're parked. Most depots combine overnight AC charging with some rapid DC chargers for quick top-ups, and phase the rollout as vehicles arrive. Load management and a supply upgrade plan are usually the critical path.
Can we install chargers across multiple sites at once?
Yes. Multi-site groups can survey and install across their estate under one programme, with one back-office system and one maintenance contract, which usually lowers the cost per charger. Grants such as the Workplace Charging Scheme can cover up to 40 sockets across your sites.
Getting started
Can we install EV chargers if we lease our building?
Usually, with your landlord's written consent. Funders and operators will also want enough time left on your lease to cover any funded agreement, or the landlord to be party to it.
How long does EV charger installation take?
A small workplace installation of a few 7 kW chargers can be done within weeks of the survey. Larger projects with groundworks, many chargers or rapid chargers usually take 2 to 6 months, and longer if the network operator needs to upgrade your supply.
What information do I need for an EV charger quote?
Your site postcode, number of parking spaces, how many chargers and what type you want, who will use them, whether you own or lease the site, and ideally photos of your car park, main electricity intake and distribution board. The form on this page collects the essentials in two minutes.